Precious Metals Recovery Pilot Plant Optimization

Project Sheet

Sector

Industrial plants

Country

Spain

Scope

Detail engineering

Year

2023

Customer

BIDASOA METAL 78, S.L.

EIA21 developed the detailed engineering required to diagnose and improve the leaching process of a catalyst recycling pilot plant, enhancing process reliability and operational performance.

Precious Metals Recovery Pilot Plant Optimization

The Challenge

To diagnose and resolve operational issues in a pilot plant designed to recover precious metals from spent catalysts. The facility, originally designed and built by third parties, was not achieving the expected performance levels during the leaching process.
The main challenge was to identify the root causes of inefficiencies in an operating plant by analyzing both the original design and real operating conditions, ensuring the technical and economic viability of the process.

The Solution

EIA21 carried out a comprehensive technical assessment of the pilot plant based on operational testing and a detailed evaluation of the leaching process performance.
The scope of work included:

  • Analysis of the process and actual operating conditions
  • Execution of performance tests to identify anomalies
  • Evaluation of existing equipment and plant configuration
  • Diagnosis of process limitations affecting the leaching system
  • Definition of engineering solutions to correct process deviations

This approach enabled the accurate identification of the factors preventing the plant from achieving its expected performance.

Results

The project successfully identified and resolved the operational issues affecting the pilot plant, restoring the conditions required for efficient precious metals recovery.
Key project outcomes included:

  • Identification of the root causes of process inefficiencies
  • Correction of operational anomalies affecting plant performance
  • Improved leaching process efficiency
  • Validation of technical solutions to support project continuation
  • Increased operational reliability of the pilot plant